Tubing Lift Installation

The forms for the new tubing lift are in with the concrete scheduled for next week.  The lift that is being installed is a Multi-SkiLift handle rope tow that will pull guests while sitting in their tubes to the top of the tubing park.  Tubing guests will walk towards the bottom of the lift in a pedestrian lane adjacent to the flatter portion of the tubing lanes’ run-out.  Once the incline begins, that is where the bottom station will be located.  The tube’s leash attaches to a handle on the lift that automatically disengages at the top.  Tubers then slide down the unload ramp before getting out of the tube to walk to the top of the lanes.  At this point an attendant will assist guests before departing down the tubing run.  More info on the tubing park and/or to make reservations can be found here:  https://www.skimonarch.com/tubing-park/