The electricians from Xcel Energy, Mishmash Electric and Skytrac have tied the drive terminal into the grid. The lift has come to life with a high voltage power supply and the bullwheel is turning! The crew from Skytrac will now work on tensioning and alignment of the haul rope before moving to loading the lift chairs (carriers) on the haul rope. We have reached another major milestone and it feels incredible to see the Tomichi Lift come to life.
