Trail clearing is underway for the No Name terrain expansion! Our contracted team from VM West is using Ponsse steep slope equipment for this timber work. These specialized machines utilize pneumatic tires with tracks and have the capability to be winched up and down the slope with an integrated cable system. Trees will be felled and processed on the western side of the Divide before forwarding the timber down to the front side of the mountain. We will once again use the deck site adjacent to the bottom Panorama lift terminal. From there, logging trucks will load the timber and take it to market. This is another major milestone! Stay tuned for photos and details as the NN trail network develops.