52"
3"
1"
CONDITIONS
SHOP
 

Tumbelina Upgrade

28 August
Categories : Mountain Ops
Posted by Scott Pressly

The Tumbelina Lift is receiving a major mechanical upgrade this summer. We are once again teaming up with the crew from Skytrac for this project. The Garfield (2011) and Breezeway (2014) lifts have seen full bottom drive terminal replacements while the Panorama Lift received a full mechanical upgrade in 2018 (gearbox, main electric drive, controls, braking) and an independent hydraulic tensioning system in 2019. The Tumbelina Lift will now be upgraded to a similar extent with a new gearbox, electric drive, auxiliary drive, braking system, controls, comm line, operator house, motor room enclosure and restraint bars. More to come on this project over the next few weeks.

Skytrac Controls
Skytrac cabinet
Skytrac mechanical system
Monarch Mountain is an equal opportunity provider and operates under a special use permit with the Pike San Isabel National Forest.
Anyone who needs assistance with accessing the content on this website please call 719.530.5000.